This overview will cover just how to develop a ground-level deck the does not require stairs and also a stairway railing. In many areas, a ground-level deck is identified as one that has actually a maximum height of 30 inches above the ground and is not attached to the house.  Ground-level decks frequently do not call for a railing roughly the perimeter, and also they may not call for a permit. Ground-level decks additionally do not incorporate the usage of a ledger board in their design. Examine with her local building department to recognize your neighborhood code requirements when building a ground-level deck.  while you have actually a good amount of adaptability in picking the ar of a free-standing ground-level deck in your yard, over there will most likely be some structure code demands to take right into account. Your local structure department will certainly specify how far away from residential property lines a deck will must be built, for this reason be certain to check prior to moving forward. Additionally consider access for getting building materials come the area. Lastly, a flat, level area is the best place because that a free-standing ground-level deck.  once you have a general idea of the style you want, carry your concepts to her local house Depot for a comprehensive drawing. You can use this drawing to calculation deck materials, and also to submit to the local building department for code approval. Store in mind that if her deck calls for a permit, the building inspector will require to check various stages of the deck build process. 


*

Depending upon her area and also local structure codes, some decks might only require ground-level footings. In many instances, decks require support indigenous concrete piers that are collection into the ground. The terms “piers” and “footings” are often used interchangeably though they room technically no the same thing. Piers deliver the deck’s weight right into the soil. Footings spread the weight out over a larger area. Depending upon building code requirements and also soil conditions in your area, footings may additionally be compelled beneath the piers to spread out the deck’s weight out. These specifications will be detailed in your deck drawings and guided by local structure codes. Your deck illustrations will indicate the size, number and also location the deck piers or deck footings.

You are watching: Can i build my own deck

begin by using batter boards and also mason's string lines come lay out the place of the piers and also footings. This will carry out the deck’s foundation. Batter boards room temporary frames used to note the elevation and location the the corners of your deck.  Lay the end the deck perimeter making use of batter boards and mason’s line. Begin by running a mason’s heat parallel come the residence first. Then run perpendicular lines to finish the perimeter, crossing the mason’s heat at the corners.  Square the corners using the 3, 4 ,5 method. Measure 3 feet from wherein the currently intersect and also make a note on the wire line. Measure up 4 feet follow me the line the runs perpendicular to the line and make a mark. Measure between the 3-foot and 4-foot point out and adjust the line till the clues are specifically 5 feet apart.  mark deck pier/footing areas using spray paint based upon the drawings. Use a posthole digger or strength auger to dig holes because that the piers/footings. Be certain to dig listed below the frost line, if forced by your regional code.  location concrete tubing forms in the holes and level them so that they rod up around 1-inch over ground level. You deserve to use scrap 1x screwed to every side that each kind to assist hold the level. The scrap 1x pieces must be long enough to stretch across the hole, suspending the tube in it.  usage the mason’s lines and also a tape measure to facility the tubes follow to the drawings, adjusting the hole locations as needed.  If you want to have all the piers the very same height, usage a lengthy level. This isn’t commonly necessary, though, as any inconsistencies deserve to be made up in the write-up lengths that will be set on top of them.  Backfill the holes roughly the tube forms, tamping the soil under every so frequently as girlfriend go.
*

Mix ready-mix concrete bags in a wheelbarrow per the manufacturer’s instructions using a shovel or mortar hoe.  pour the blended concrete right into the pipe form, then place a post anchor bolt into the facility of every footer prior to the cement begins to harden. Leave enough of the bolt above the footing to attach to the short article base. Note: use a mason’s string line stretched throughout the tubing develops to align the anchor bolts. enable time because that concrete to cure follow to manufacturer’s instructions.  once the concrete has cured, set post bases end each anchor bolt and align follow to layout shown on the drawings. 
*

her deck plan likely call for write-ups to be collection on each article base to it is in bolted come the deck framing later. In part cases, your deck to plan may call for a beam to be collection directly in the article bases. If plans call for posts, cut them a couple of inches over the finished elevation of the deck framing. You can reduced them flush later.  set the short articles in the article base and also attach with ideal post-base hardware pond or screws.  If your deck plans call for a do the washing up beam (a beam collection within the same aircraft as the deck’s framing), set the beam straight onto the short article bases. Use metal strapping hardware or composite shims to fine-tune the beam level. Nothing use timber shims together they will compress end time. Connect the beam come the write-up bases making use of post-base hardware nails or screws.  examine beam alignment and readjust as needed to make sure beams are square.
*

With the short articles or beams in place, that time to construct the deck frame. Due to the fact that the deck is free-standing, that does not call for a ledger board, which gets attached come the house. Instead, her deck will consist of rim joists that comprise the deck’s perimeter, to be filled in v joists that will assistance the decking.

If building a low-level deck that is associated to posts collection within the framing, attach the rim joist come the write-ups using galvanized 10D typical nails, or 3-inch galvanized screws. Usage one fastener per write-up as these are just temporary. Use a long level and also a helper come ensure the rim joist is level. install the remaining rim joists in the same manner to produce the perimeter of the deck. Secure the pickled in salt joist come the posts using the appropriate hardware suggested by the drawings and your local structure code. In most cases, specially-designed structural screws may be used, galvanized through-bolts or galvanized lag bolts.  reduced the short articles flush come the height of the pickled in salt joist so the the decking have the right to sit easily over that later.  If the beams stand for the ends of the deck, end up the political parties by installation a pickled in salt joist on either side. The perimeter the the deck is now consisted of of a beam on either end, and also a rim joist on either side.  add any extr hardware compelled by code, such together angle brackets.

Tip: many framing lumber has actually a slim bow in it along its edge. This is dubbed a “crown.” install the pickled in salt joists and all framing materials so the the “crown” is up. 


*

With the deck’s rim joist complete, that time to install the joists. 

begin by laying the end the joist spacing top top opposing in salt joists. Pull your tape measure across the rim joist and also mark the joist place which will be every 12, 16 or 24 inches, per your drawings. If her deck is made up of 2 beams, traction your measurements along the beams and also mark the beams.  Repeat this process across the in salt joist (or beam) parallel or the contrary the one you just marked. Be sure to pull her layout indigenous the same side of the pickled in salt joist as you did in the ahead step. Go back and use a square to note a line down the inside face of the in salt joist / beam and also place an x on the next of the line that is the opposite from where you pulled her measurement from. Therefore if girlfriend pulled her measurement native the left, ar the x top top the right of the line. If you pulled your measurement indigenous the right, place the x ~ above the left side of the line.  this lines indicate the side of the joists and the x is wherein the end of the joist will go. It’s frequently easier to download joist hangers now, yet you will need to make sure that they are put at the suitable height. If you’re installing the joists between the beams, you’ll need to install the joist hangers first.  To download joist hangers, you have the right to make a simple template utilizing a reduced end that the joist material that’s around 3 come 4 inch long. Pond a scrap piece of lumber on optimal of the cut joist piece so that it hangs end the end around 1 come 2 inches. Now, usage this layout to it is registered the joist hanger on together you collection it.  set the theme so that the peak registers top top the pickled in salt joist, and the cut end that the joist item sits wherein the joist will certainly go. Hold the joist hanger to the template, pond each hanger in place using the suitable structural pond or screws (hold the sides of the joist hanger slightly loosened so the you deserve to slide the joist in place later). Repeat till all hangers room installed. Measure up the joist length using the area closest come the end (the area in the middle may have bowed in or out slightly). Now cut all of the joists come length, and set in the joist hangers. Pond the joists using hardware-appropriate structural nails or screws.  If she installing her joists in between two rim joists rather of a beam, you have the right to install the joists very first and then the joist hangers later.  cut the joists come length, then pond them ~ above the layout indigenous the outside of the in salt joist utilizing galvanized 10D common nails.  v the joists in place, go back and download the joist hangers making use of the hardware-specific structural pond or screws. Remember to crown the joists before you install them. Now, include self-adhesive flashing tape across the top of the joists to help prolong the life that them. This is an optional step that adds some cost, yet is becoming a best practice amongst professional deck builders. 
To begin the decking so that it’s parallel to the house, align the leaf of the first deck plank so the it is parallel to the house and run the fasteners in. Let the end run lengthy on one of two people side.  If did you do it pre-planned and are certain you will finish with a full-sized board, you can start against the house and move outward. If you are not certain where the final board will land, start with the plank farthest indigenous the house and move towards the house. proceed running boards in this way, keeping the ideal spacing between boards. If using covert fasteners, the fasteners have actually spacing built into them. If face-screwing pressure-treated timber decking, maintain around a 1/8 to 3/16-inch spacing between boards. 1/8-inch is frequently recommended together the decking will tend to dried over time, shrinking and making the gap larger. You execute want come have space between the deck boards to permit for drainage and air-flow. together you download the decking plank perpendicular come the joists, drive 2 fasteners v each board into the facility of each joist. Place each fastener 3/4 come 1 inch from the edge of the board. As you relocate to the finish of the deck (or in the direction of the house), measure the street at each corner to ensure you are relocating in a straight line and will finish parallel come the in salt joist (or house, depending on the direction she going). If running deck board on a deck that is not near the house, begin by snapping a line that is equidistant at each corner and allows for 1-inch to 1-1/2-inch overhang follow me the length of the an initial board. Install the very first board together above, and also repeat the process.

Tip: for the finest appearance, stagger the seams between nearby rows of decking. Seams must look arbitrarily so save them 2 or more joists away from one another.

See more: Boy Meets World Then And Now, All Grown Up: See The Cast Of


With the board in place, that time to trim the ends. 

begin by pulling a measure up of 1 inch or 1-1/2 customs at every corner, then snap a chalk line throughout the decking end to connect the two. Repeat the procedure on opposing edge. Cut along the line utilizing a one saw. To ensure a specific cut, screw or clamp a temporary overview for the circular, or usage a monitor saw. When the cuts space complete, you deserve to go ago and operation a router equipped with a bottom-bearing 1/4-inch round-over little to lull the edge. If girlfriend don’t have a router, a sander equipped through 120-grit sandpaper will job-related as well.

Learning how to build a deck needs a command of simple carpentry and a commitment of time and also resources. As soon as completed, a deck adds worth to your home and helps you reap the the end in better comfort.

When determining just how much lumber you need, nothing guesstimate, calculate. Know exactly how much you need with our project calculators. For more help when constructing a deck, contact our professionals in the Installation services department.